Currently Underway & Coming Soon
- Initial stadium fencing upgrade
- In ground picnic tables and benches around campus
Six years ago, a seed of a vision for Front Range Christian School was born. This vision both built on tradition, allowing for the hopes and dreams of what our school could be, as well as a driving need to propel the school into the future God intends. Through intense prayer, dreaming, planning, and what can only be called inspired revelation, The Nehemiah Project was born.
While the project is divided into three distinct phases, the overarching goals are the same for each phase:
The benefits are far reaching and range from increased school pride, a greater presence in the community at large, and increased enrollment which not only broadens the impact of the school but also allows FRCS to meet the needs of more students.
We are excited to announce that a great portion of Phase 1 has already been funded! Plans are well underway and work is already beginning on each project within Phase 1.
The Commons Renovation includes a complete renovation of the bathrooms, reconfiguring the entrance doors, building a breezeway, and creating a much-needed student center.
The Genesis Center is a new area that will allow students to create and work with their hands while providing space for STEM education and experiences. Features will include woodworking and metalworking areas, sewing areas, 3D printers, robotics station, collaboration areas, and so much more. It’s the ultimate invention center!
Falcon Field will soon have a new, grand entrance. Details include signage to clearly and beautifully guide visitors to the field; attractive fencing that will increase pride and provide additional security; and garden space to welcome fans and visitors.
The Performing Arts Center is receiving several upgrades including a new, state of the art lighting system, sound paneling, and new sound equipment. These improvements will help us continue to offer excellence in our Fine Arts programs while paving the way for expanding the center in later phases.
The Athletic Building has great potential that has not yet been tapped. In Phase 1 of The Nehemiah Project, we will create team rooms, which will include lockers, a restroom, washer and dryer, and team meeting space.
Phases 2 and 3 will begin when Phase 1 is complete and as resources are available. We are already accepting contributions to The Nehemiah Project to begin Phases 2 and 3 as soon as possible. Projects for these phases include: